San Kamphaeng Solar Power Plant

san-kamphaeng2

Location San Kamphaeng District, Chiang Mai Province

Generating Capacity 14 kW

Background
         EGAT installed 14 kW solar cells at San Kamphaeng Solar Power Plant in Chiang Mai Province and connected to the distribution system of Provincial Electricity Authority on June 18, 1993. It is the country‚Äôs third solar power plant that has been connected to the grid following Khlong Chong Klum Solar Power Plant and Phromthep Cape Renewable Energy Power Plant, but the first one in the northern region.