EGAT’s Installed Generating Capacity

August 2025

TypeMW%
Renewable Energy3,143.6219.36
Hydropower (large dam)
– Bhumibol779.204.80
– Sirikit500.003.08
– Ubol Ratana25.200.15
– Sirindhorn36.000.22
– Chulabhorn40.000.24
– Srinagarind720.004.43
– Vajiralongkorn300.001.85
– Tha Thung Na39.000.24
– Kaeng Krachan19.000.12
– Bang Lang84.000.52
– Rajjaprabha240.001.48
– Pak Mun136.000.84
– Chao Phraya12.000.07
– Kwae Noi Bumrung Dan30.000.18
– Mae Klong12.000.07
Hydropower (small dam)
– Nam Pung6.000.04
– Ban Santi1.280.01
– Mae Ngat9.000.06
– Huai Kum1.060.01
– Naresuan8.000.05
– Khlong Chong Klum0.02
– Ban Yang0.12
– Ban Khun Klang0.20
– Huai Kui Mang0.10
– Khun Dan Prakan Chon10.000.06
– Pasak Jolasid6.700.04
– Kiew Kho Ma5.500.03
– Chulabhorn – Downstream Hydro Power Plants1.250.01
– Khlong Tron2.500.02
– Pha Chuk14.000.09
Renewable Energy Other
Fang – Geothermal Power Plants0.30
Solar Power Plant
– Khlong Chong Klum0.02
– Phrom Thep0.01
– San Kamphaeng0.01
– Pha Bong3.200.02
– Sirindhorn46.260.28
– Thap Sakae5.000.03
– Ubol Ratana24.000.15
Wind turbine
– Phrom Thep0.19
– Lamtakong Jolabha Vadhana2.500.02
– Lamtakong Jolabha Vadhana 224.000.15
Thermal Power Plant3,687.0022.71
– Bang Pakong Units 3, 41,152.007.10
– Mae Moh Units 8-142,220.0013.67
– Krabi315.001.94
Combined Cycle Power Plant8,400.0051.74
– Bang Pakong Blocks 5710.004.37
– South Bangkok Blocks 3710.004.37
– South Bangkok Blocks 41,220.007.52
– Nam Phong Blocks 1-2650.004.00
– Wang Noi Blocks 4750.004.62
– Chana Blocks 1710.004.37
– Chana Blocks 2766.004.72
– North Bangkok Blocks 1670.004.13
– North Bangkok Blocks 2828.005.10
– Bang Pakong Blocks 11,386.008.54
Diesel4.400.03
– Mae Hong Son Units 2-64.400.03
Other (pumped storage hydropower plant)1,000.006.16
– Lamtakong Jolabha Vadhana1,000.006.16
Total16,235.02100.00