EGAT’s Contracted Generating Capacity

February 2026

TypeMW%
Renewable Energy3,143.6220.74
Hydropower (large dam)
– Bhumibol779.203.30
– Sirikit500.003.19
– Ubol Ratana25.200.17
– Sirindhorn36.000.24
– Chulabhorn40.000.26
– Srinagarind720.004.75
– Vajiralongkorn300.001.98
– Tha Thung Na39.000.26
– Kaeng Krachan19.000.13
– Bang Lang *84.000.55
– Rajjaprabha240.001.58
– Pak Mun136.000.90
– Chao Phraya12.000.08
– Kwae Noi Bumrung Dan30.000.20
– Mae Klong12.000.08
Hydropower (small dam)
– Nam Pung6.000.04
– Ban Santi1.280.01
– Mae Ngat9.000.06
– Huai Kum1.060.01
– Naresuan8.000.05
– Khlong Chong Klum0.02
– Ban Yang0.12
– Ban Khun Klang0.20
– Huai Kui Mang0.10
– Khun Dan Prakan Chon10.000.07
– Pasak Jolasid6.700.04
– Kiew Kho Ma5.500.04
– Chulabhorn – Downstream Hydro Power Plants1.250.01
– Khlong Tron2.500.02
– Pha Chuk14.000.09
Renewable Energy Other
Fang – Geothermal Power Plants0.30
Solar Power Plant
– Khlong Chong Klum0.02
– Phrom Thep0.01
– San Kamphaeng0.01
– Pha Bong3.200.02
– Sirindhorn46.260.31
– Thap Sakae5.000.03
– Ubol Ratana24.000.16
Wind turbine
– Phrom Thep0.19
– Lamtakong Jolabha Vadhana2.500.02
– Lamtakong Jolabha Vadhana 224.000.16
Thermal Power Plant2,607.0017.20
– Bang Pakong Units 3, 41,152.007.60
– Mae Moh Units 8,11,14 *1,140.007.52
– Krabi315.002.08
Combined Cycle Power Plant8,400.0055.43
– Bang Pakong Blocks 5710.004.68
– South Bangkok Blocks 3710.004.68
– South Bangkok Blocks 41,220.008.05
– Nam Phong Blocks 1-2650.004.29
– Wang Noi Blocks 4750.004.95
– Chana Blocks 1710.004.68
– Chana Blocks 2766.005.05
– North Bangkok Blocks 1670.004.42
– North Bangkok Blocks 2828.005.46
– Bang Pakong Blocks 11,386.009.15
Diesel4.400.03
– Mae Hong Son Units 2-64.400.03
Other (pumped storage hydropower plant)1,000.006.60
– Lamtakong Jolabha Vadhana1,000.006.60
Total15,155.02100.00