Nam Phong Power Plant

Characteristics of the Power Plant

Type of power plantCombined cycle
Contractual generating capacity650 MW
Generating capacity of Block 1325 MW
Generating capacity of Block 2 325 MW
FuelNatural gas/diesel oil

The total investment of Nam Phong Power Plant Blocks 1-2 is 14,947.55 million Baht. Block1 costs 6,412.58 million Baht, and Block 2 costs 8,534.97 million Baht.

Construction and operation

Block 1:  Power supply to the system
Gas turbine Unit 1  November 26, 1990
Gas turbine Unit 2  December 26, 1990
Steam turbineAugust 29, 1992
Block 2:  Power supply to the system
Gas turbine Unit 1 March 15, 1993
Gas turbine Unit 2  April 11, 1993
Steam turbine April 9, 1994