Nam Pung Dam

In the past, the northeastern part of Thailand usually faces the drought problem. Water source development plays an important role for the people in this region. Realizing the benefit to the local people, “Nam Phung Dam,” a project of Lower Mekong Basin Development Project, was constructed. Nam Phung Dam will alleviate the flood in the […]

EGAT

24 May 2023

Chulabhorn Dam

Despite the government’s accelerated development of several hydropower plants in the Northeast, it could not meet the rising electricity demand. EGAT was required to seek a new power source and construct an additional power plant to meet the demand sufficiently. Chulabhorn Dam, formerly known as “Nam Phrom Dam,” was a power project under the Northeastern […]

EGAT

24 May 2023

Sirindhorn Dam

Sirindhorn Dam is an important multipurpose dam of the Northeastern part of the country. In addition to electricity generation, the dam gives several benefits for the wellbeing of the local people including irrigation, flood alleviation, fishery, and tourism. The dam construction is regarded as a way of utilizing local resources for the maximum benefit which […]

EGAT

23 May 2023

Vajiralongkorn Dam

The Kwai Noi River is one of the important rivers of the country, originated from Ta Nao Sri mountain range flowing pass Kanchanaburi Province with the total length of 390 kilometers. According to the Mae Klong River Basin Development Plan, the Electricity Generating Authority of Thailand (EGAT) has developed the plan to generate electricity which […]

EGAT

23 May 2023

Ubol Ratana Dam

In response to the Economic and Social Commission for Asia and the Pacific (ESCAP)’s concept to develop countries in the Southeast Asia region, the Coordinating Committee for Lower Mekong Survey was established. The government at that time was advised to build the Ubol Ratana Dam for electricity generation, irrigation, consumption, industry, flood prevention, fishery, and […]

EGAT

23 May 2023

Sirikit Dam

The Nan River is an important river after the Ping River, one among the four tributaries that form the Chao Phraya River. In order to gain full results for agriculture in the Chao Phraya Central Plains, it is necessary to build the dam on the Nan River to reduce flood problems and increase water in […]

EGAT

23 May 2023

Bhumibol Dam

“….I agree with the government that this first multipurpose project in our country is the beginning of developing the new economy to expand far and wide. Presently, water is essential for life, also water and electricity promote progress in life. When the number of population has increased rapidly, water and electricity has to meet the […]

EGAT

23 May 2023

Srinagarind Dam

Srinagarind Dam is the first multipurpose dam of the Mae Klong River Basin Development Project to provide benefits in various aspects and strengthen the irrigation efficiency of the Mae Klong Yai Project.            Srinagarind Dam is one of the tourist attractions in Kanchanaburi Province which provides knowledge and enjoyment to over 100,000 visitors a year, […]

EGAT

23 May 2023

泰国国家电力局-友好战略合作联盟,携手推动清洁能源发电厂向前发展 “乌汶拉水库混合浮动太阳能发电项目”迈向碳中和目标

泰国国家电力局-友好战略合作联盟,携手推动清洁能源发电厂向前发展 “乌汶拉水库混合浮动太阳能发电项目”迈向碳中和目标 泰国国家电力局-友好战略合作联盟,该联盟包括MITR PHOL能源服务有限公司、PEA ENCOM国际有限责任公司和东方电气集团国际合作有限公司共同在内的多家公司共同签署合作协议,将与位于孔敬府的乌汶拉水库发电站共同建造混合浮动太阳能发电项目,保障可循环利用能源的稳定性以达到可持续发展的目标,推动国家发展以实现碳中和目标。 佛历2566年5月10日,中华人民共和国驻泰王国大使馆经商处公参王立平先生、泰国国家电力局局长Bunyanit Wongrakmit先生以及公司董事长兼友好合作联盟主席Bunthaeng Vongkusolkit先生出席了在曼谷JW万豪酒店举办的泰国国家电力局与友好合作联盟共同合作实施的孔敬府的乌汶拉水库发电站混合浮动太阳能发电项目的购买及雇佣合同签署仪式。仪式上,泰国国家电力局可循环能源和电站发展部部长Tidet Iamsai先生、管理委员会副主席Kritsada Monthienwichianchai先生、MITR PHOL能源服务有限公司泰国糖业、能源和新商业管理负责人Verajet Vongkusolkit先生、东方电气集团国际合作有限公司董事长李建华先生以及PEA ENCOM国际有限责任公司副董事长Payomsarit Sripattanon先生共同签署了该合约。 中华人民共和国驻泰王国大使馆经商处公参王立平先生表示,中泰两国之间再见经济贸易方面建立了十分友好的合作关系,中国作为泰国最大的贸易合作伙伴,并且中国公司也擅长于与泰方合作共同发展太过的工业,例如清洁能源、现代农业、数字经济。在能源工业方面,泰国国家电力局致力于发展清洁能源以响应泰国政府为实现碳中和目标而制定的相关政策,东方电气集团国际合作有限公司作为中国能源领域的领先集团,同时也是泰国的友好合作伙伴,坚信能够促成可持续发展项目的成功建设,同时能够促进学术方面的合作从而为中泰两国带来更大的利益。 泰国国家电力局局长Bunyanit Wongrakmit先生表示,乌汶拉水库的发展项目是泰国国家电力局发展清洁能源项目中的一部分,我局计划在全泰国发展混合浮动太阳能发电项目共计15个,以满足国家政策计划将长期使用清洁能能源的需求。同时,泰国国家电力局还遵循3S战略前进,3S战略即资源转换(Sources Transformation),增加可循环使用能源电力生产的比例,发展可代替技术以满足可循环能源的使用;联合创建池槽(Sink Co-creation),增加可吸收存储碳的区域;支持措施机制(Support Measures Mechanism),呼吁人民共同参与减少碳排放的行动中,鼓励人民使用电动汽车。 乌汶拉水库项目具备24兆瓦的发电率,采用太阳能和水能混合式发电模式,同时还配备专门的电池储能系统。有助于提高通过可循环能源发电的稳定性,该项目的落地可称为是泰国国家电力局作为清洁能源生产者向前发展迈出的一大步,同时也是国家计划于公历2050年实现碳中和目标的重要一步。 公司董事长兼友好合作联盟主席Bunthaeng Vongkusolkit先生补充说道,合作联盟的目标推动贸易发展的同时为社会和环境创造可持续发展的基础,通过20年来从农业生产中致力发展环境友好型可循环使用能源,转变为新式能源的发展,例如太阳能。从而支持清洁能源的生产来助力减少温室气体的排放,已实现在佛历2065年泰国社会将达到碳0排放的目标。本次的合作,可以视为是国内外该领域的政府与民间专家之间的合作,目的是为了推动可循环使用能源使用需求呈增加趋势的发展,同时也是为经济、社会和环境体系建立可耻寻发展的重要组成部分。 东方电气集团国际合作有限公司董事长李建华先生说道,东方电气集团作为可持续发展和环境友好型能源工业的开拓者,在全球范围内实施了多项可循环使用能源的项目,例如太阳能、风能和能源存储系统。本次的合作,将成为中国与泰国共同合作助力泰国乃至全世界步入零排放社会的榜样式合作。 PEA ENCOM国际有限责任公司副董事长Payomsarit Sripattanon先生表示,泰国国家电力局在乌汶拉水库发展的项目,能够提高泰国在清洁能源使用方面的稳定性,减少引起全球变暖主要因素—温室气体的排放,该主旨符合PEA ENCOM公司的建立初衷和商业计划,我公司与能源工业领先组织建立商务合作伙伴关系,因此坚信本次合作共同施行的项目最终能够圆满落地,实现泰国国家电力局既定的目标,相信该项目的成功落地能够为国家和人民带来更多的利益。

EGAT

23 May 2023

EGAT announces sale of bidding documents for Mae Moh Solar Farm Project from today until end of May 2023 to promote clean energy

EGAT announces sale of bidding documents for Mae Moh Solar Farm Project from today until end of May 2023 to promote clean energy EGAT announced the sale of bidding documents for Mae Moh Solar Farm Project in Lampang Province to promote clean energy use in the operation of EGAT Mae Moh Mine, driving Thailand toward […]

EGAT

19 May 2023
1 … 24 25 26 … 71
Skip to content